Mavi Deniz Buoy Laying Vessel is designed to install and maintain navigation buoys and beacons in coastal, harbors, and open seas. Buoy Laying Vessel’s primary purpose is maintaining and installing the buoys. She can assist in search and rescue operations, ice-breaking activities, towing vessels, hydrographic survey operations, firefighting, and oil combating situations.
Buoy Laying Vessel has a strengthened hull that can be used as a multi-purpose vessel. Buoy Laying Vessel can operate on the spacious, unique working deck space for associated buoy/chain handling and lifting machinery with A-frame or Crane.
Buoy Laying Vessel can operate throughout all seasons and is optimized to provide a safe working platform and operation for lifting, deploying, laying, handling, and maintaining stability and sea-keeping.
Buoy Laying Vessel continuously uses the Directorate General of Turkish Coastal Safety in the Marmara, Black, Aegean, and Mediterranean Seas. Buoy Laying Vessel is awaiting standby in Istanbul Bosphorus for an Emergency Oil Spill Operation.
International Maritime Organization announced a strategy to reduce greenhouse gas (GHG) emissions to zero by the end of this century, and marine environmental regulations have been tightened worldwide. The implementation of emission control areas has begun to affect vessel operations. Mavi Deniz has successfully started new emission control regulations by developing dual-fuel solutions and cleaner green power technologies. Mavi Deniz’s Green Power Options; Solar Energy System, Battery Power System, Hydrogen Fuel Cell System, and LGG System can fully integrate into Buoy Laying Vessel, including deck equipment and propulsion system.
Buoy Laying Vessel Green Power Options
- Powered by Solar Energy System
- Powered by Battery Power System
- Powered by Hydrogen Fuel Cell System
- Powered by LPG System
We can arrange the design for your needs, operational profile, and requirements, and also Buoy Laying Vessel models can equip with the following:
- Buoy Laying + handling
- Mooring Handling
- Oil Spill Response
- Diving Support
- Fire Fighting
- Wreck Marking
- Towing
- Hydrographic Survey
- Fishery Protection
- Supply Vessel
- Dynamic Positioning
After delivering the Buoy Laying Vessel, you will see the same performance and quality years and years later. One reason to catch the performance and quality; We don’t choose cheap products; we pick the best material and products for building the Buoy Laying Vessel and choose the best workers and engineers.
| Buoy Layer 30 | Buoy Layer 40 | Buoy Layer 50 | Buoy Layer 60 | Buoy Layer 70 |
|---|
| | | | | |
| Dimensions | | | | | |
| Length | 30 m | 40 m | 50 m | 60 m | 70 m |
| Beam | 8 m | 10 m | 12 m | 14 m | 16 m |
| Draft | 2.5 m | 3.4 m | 4 m | 4.5 m | 5 m |
| | | | | |
| General | | | | | |
| Purpose Of Vessel | Buoy Laying and Handling (Standard) + Optional (Oil Spill Response + Fire Fighting + Wreck Marking + Towing + Hydrographic Survey + Fishery Protection + Supply) | | | | |
| Paint | Epoxy coating underwater hull, decks & superstructure with a lifetime of about 3 years. | | | | |
| Hull Type | Mono Hull ( Standard ) or Catamaran ( Optional ) | ice Class (Optional) | | | | |
| Material (Superstructure + Hull) | Steel ( Standard ) or Aluminium ( Optional ) | | | | |
| Classification | B.V. Or Equivalent | | | | |
| Tank Capacity | | | | | |
| Fresh Water Tank | 40 m³ | 50 m³ | 60 m³ | 100 m³ | 300 m³ |
| F/O Tank | 27 m³ | 100 m³ | 150 m³ | 170 m³ | 600 m³ |
| | | | | |
| Power and Propulsion | | | | | |
| Propulsion | Fixed Pitch ( Standard ) | Azimuth Thruster ( Optional ) | | | | |
| Power | Diesel ( Standard ) | Battrry ( Optional ) | | | | |
| Green Power | Battery ( Optional ) | Hydroen Fuel Cell (Optional) | Solar Energy (Optional) | LNG System (Optional) | | | | |
| Engine | 2 x 588 Kw | 2 x 970 Kw | 2 x 1170 Kw | 2 x 1500 Kw | 2 x 700 Kw |
| Thruster (Bow - Stern) | 100 Kw - Bow | Optional (Stern) | 120 Kw - Bow | Optional (Stern) | 200 Kw Bow | Optional (Stern) | 300 Kw Bow | Optional (Stern) | 400 Kw Bow | Optional (Stern) |
| Speed | ( Optional Speed ) Up to 16 knots | | | | |
| | | | | |
| Oil Pollution Recovery System | | | | | |
| Oil Recovery Rate (Optional) | 2 x 100 m³ / hr | 2 x 200 m³ / hr | 2 x 200 m³ / hr | 2 x 200 m³ / hr | 2 x 200 m³ / hr |
| Type of Oil Skimmer (Optional) | Sweeping Arm or Side Collector or Multi Skimmer | | | | |
| Oil Spill Detection (Optional) | 1 - 4 miles radius | 1 - 4 miles radius | 1 - 4 miles radius | 1 - 4 miles radius | 1 - 4 miles radius |
| Infrared Camera (Optional) | Infrared Tracking Camera | | | | |
| Dispersant System (Optional) | MaviSpray - 100 lt/min | MaviSpray - 100 lt/min | MaviSpray - 100 lt/min | MaviSpray - 100 lt/min | MaviSpray - 100 lt/min |
| | | | | |
| Auxiliary Equipment | | | | | |
| Sewage Treatment Plant | 25 liters/hr | 50 liters/hr | 100 liters/hr | | |
| Generator Sets | 2 x 150 Kw | 3 x 200 Kw | 3 x 280 Kw | 3 x 280 Kw | 3 x 280 Kw |
| | | | | |
| Electronic and Navigation | | | | | |
| Standard | GMDSS Sea Area A3, GPS, Echo Sounder, Compass, VHF. Navigational Safety Lights, Autopilot, Radar, Internet Access (all cabins), Intercom | | | | |
| Optional | Hydrographic Survey System ( Multi beam echo sounder , Single beam echo sounder, hull mounted sonar ) / Dynamic Position System ( DP 1 - DP 2 ) / Search Light | | | | |
| | | | | |
| Deck System | | | | | |
| Deck Operation | Storage + Workshop + Load Handling + Maintance | | | | |
| Crane | ( Hydraulic Foldable Knuckle Crane - Up to 10 tons @ 10m ( Optional Capacity ) ) Optional | A- Frame up to 40 tons ( Optional Capacity ) | | | | |
| Rescue Device | 1 x Rescue Boat | | | | |
| Work Boat | 1 x Rhib | | | | |
| Anchor Windlasses | 1x High Holding Power | 2 x High Holding Power | 2 x High Holding Power | 2 x High Holding Power | 2 x High Holding Power |
| Buoy Chain Capstans | ( Optional Capacity ) Up to 20 ton | | | | |
| Towing Winch | ( Optional Capacity ) Up to 40 ton | | | | |
| Chain Winch | ( Optional Capacity ) Up to 15 ton | | | | |
| Optional | Diving Equipments / Fire Fighting Equipment (Up to 600 m3/h monitor) / Helideck | | | | |
| | | | | |
| Accommodation | | | | | |
| Optional | Upto 40 Persons - WC / Changing Room / Mess Room / Spare Berths / Private Sanitary Facilities / Lounges / Conferance Room / Office / Gymnasium | | | | |
| | | | | |