The Mavideniz Flood Control Barrier consists of PVC tubes filled with water. The Mavideniz Flood Control Barrier can control floods up to 2.5 m in height. Flood Control Barrier is designed to divert up to 100% of floodwaters. Flood Barrier can use flood control & prevention, dam rehabilitation, boat ramp ( construction & repair), footings ( bridge, pier, canal ), pipeline crossing, stream diversion, pond liner repair, remediation, Haz-Mat, wetland restoration, construction projects, lake restoration.
The Mavideniz Flood Control Barrier is much more efficient than sandbags; no heavy equipment is required, therefore, protecting our environment and, with no environmental damage, entirely environmentally friendly. Flood Control Barrier can be installed far quicker, at a fraction of the cost. Also, Flood Control Barrier is flexible and quickly deployed, making it ideal as a flood barrier for fast response to flood threats or prevention. Installing a Flood Control Barrier requires only portable pumps, an onsite water supply, and two or more laborers, depending on the project’s size. Sections of the Flood Barrier can quickly join to create more extended parts of the protective barrier. Section length can be arranged up to 50m for your requirements. The 15-meter-long section is only 25 kilograms when empty. A flood Barrier can be ready to deploy within 90 seconds.
Features
- Mobile flood protection
- Flexible and easy to use
- Easy to clean and reusable
- The low operation, storage, and logistics cost
- Protection height and length can arrange for your requirements
- Applicable to ISO standards
- UV Resistant + Chemical Resistant