On December 9, 20224, during the evening hours when oil was transferred to the oil tanker, the oil flowing under pressure due to the opening of the connection section of the pipeline squirted out and polluted the ship’s surface and the Port dock.
The oil that had contaminated the ship’s side, chimney, boat and deck was cleaned with Special Chemicals and oil absorbents. The operation was completed in a short period of 5 hours.[/fusion_builder_column][/fusion_builder_row][/fusion_builder_container]
